BLD-Final | 11/30/2000 | 12/1/2000 | 12/1/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### mech final ok final building ok pending elec final 12/1/2000 3:24:29 PM
|
BLD-Framing/Rough-in | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PASS |
Steven Webb
|
|
|
###-#### : ok to cover. 11/17/2000 3:06:25 PM
|
BLD-Framing/Rough-in | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | FAIL |
Dave Hannah
|
|
|
Swank ###-####
|
BLD-Framing/Rough-in | 11/1/2000 | 11/2/2000 | 11/2/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to side 11/2/2000 10:18:08 AM
|
BLD-Footing | 10/20/2000 | 10/23/2000 | 10/23/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### ftg poured 10/23/2000 11:30:26 AM
|
BLD-Foundation | 10/23/2000 | 10/23/2000 | 10/23/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/23/2000 fnd wall... add straps, ok to pour
|
BLD-Footing | 10/18/2000 | 10/19/2000 | 10/19/2000 | A | PASS |
Tom Arcoraci
|
|
|
FT--LU ###-####
|