BLD-Final | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | PASS |
Steven Webb
|
|
|
###-#### jim c. of C. #21603 issued 9/28/2001 12:25:32 PM
|
BLD-Final | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | FAIL |
Steven Webb
|
|
|
fn jim ###-#### c/n issued--several items plus not all required signatures are completed. 9/27/2001 10:23:41 AM
|
BLD-Energy code compliance | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | PART |
Steven Webb
|
|
|
Jim ###-#### early as possible: C/n posted on site--ok to cover except fireplace areas, provide energy report prior to issuance of c. of o., repair damaged floor joist in crawl. 4/10/2001 9:11:22 AM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/4/2001 | 4/4/2001 | P | PART |
Tony Young
|
|
|
fr insp -- jim-- ###-####
c/n posted on insulation tag, ok to insulate, verify flood plain elevation cert., prior c/n on m/b floor joist and temp. glass 4/4/2001 4:21:58 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### C/N posted on site. 4/3/2001 11:46:53 AM
|
BLD-Framing/Rough-in | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PASS |
Steven Webb
|
|
|
exterior shear insp jim-- ###-####
|
BLD-Foundation | 11/20/2000 | 11/21/2000 | 11/21/2000 | A | PART |
Steven Webb
|
|
|
###-####. not completed, steel in place. 11/21/2000 10:51:15 AM
|
BLD-Footing | 11/15/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Russ Owen
|
|
|
###-#### needs compaction report. 11/17/2000 9:05:50 AM
|