BLD-Final | 6/25/2001 | 6/25/2001 | 6/25/2001 | P | PASS |
Dave Hannah
|
|
|
Jim ###-#### code to get in is 4323 enter
|
BLD-Final | 6/15/2001 | 6/15/2001 | 6/15/2001 | P | FAIL |
Russ Owen
|
|
|
code for garage 4323 Jim ###-####. inspections records indicate a c/n was posted on front window by 408 on4/19/01 .Not able to contact prior inspector, And correction notice is not on site, called contractor and left message to provide prior c/n. 1/15/2002 4:10:07 PM 1/15/2002 4:11:18 PM 1/15/2002 4:11:56 PM
|
BLD-Final | 6/14/2001 | 6/14/2001 | 6/14/2001 | A | FAIL |
Jim Sly
|
|
|
Jim ###-#### No access......called. 6/14/2001 10:06:31 AM
|
BLD-Final | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | FAIL |
Tom Arcoraci
|
|
|
Jim ###-#### cn posted on front window 4/19/2001 10:04:42 AM
|
BLD-Energy code compliance | 2/2/2001 | 2/2/2001 | 2/2/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 2/2/2001 3:06:35 PM
|
BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 16:58:36. Contact: ###-####. 2/2/2001 9:16:00 AM items not completed from 1/24 c/n 2/2/2001 9:32:50 AM
|
BLD-Framing/Rough-in | 2/2/2001 | 2/2/2001 | 2/2/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 11:07:52. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/30/2001 | 1/30/2001 | 1/30/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 07:31:11. Contact: ###-####. Compl prev corr........ 1/30/2001 4:09:27 PM
|
BLD-Framing/Rough-in | 1/23/2001 | 1/25/2001 | 1/24/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/23/2001 at 08:06:26. Contact: ###-####.\\WRONG DATE
|
BLD-Framing/Rough-in | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### OR ###-#### C/N issued. 1/24/2001 4:20:16 PM
|
BLD-Framing/Rough-in | 12/18/2000 | 12/19/2000 | 12/19/2000 | A | PART |
Jim Sly
|
|
|
###-#### Shear wall OK. 12/19/2000 9:30:10 AM
|
BLD-Framing/Rough-in | 12/13/2000 | 12/14/2000 | 12/14/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 12:26:43. Contact: ###-####. Complete prev corr. 12/14/2000 1:57:06 PM
|
BLD-Framing/Rough-in | 12/4/2000 | 12/5/2000 | 12/5/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N...Add HDs and straps per Eng. 12/5/2000 11:33:53 AM
|
BLD-Framing/Rough-in | 12/1/2000 | 12/4/2000 | 12/4/2000 | A | FAIL |
Jim Sly
|
|
|
Jim ###-#### Need appr plans on site. 12/4/2000 11:08:42 AM
|
BLD-Foundation | 9/25/2000 | 9/25/2000 | 9/25/2000 | P | FAIL |
Jim Sly
|
|
|
found wall--brian--###-#### Wall poured without inspection.....2:45 PM. 9/25/2000 2:58:07 PM
|
BLD-Footing | 9/22/2000 | 9/22/2000 | 9/22/2000 | P | PART |
Jim Sly
|
|
|
###-#### Early start footing. 9/22/2000 1:08:14 PM
|
BLD-Footing | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### 941 NR -0991 9/20/2000 3:35:41 PM
|