BLD-Final | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PASS |
Tony Young
|
|
|
Added by Inspector: 415 On 1/22/2002 12:17:14 PM
|
BLD-Framing/Rough-in | 1/18/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Tony Young
|
|
|
###-####
final ok also,,,some roof areas not done yet as owners are going to apply for new permit for new addition and will take care of roof at that time. life safety items ok 1/22/2002 12:21:38 PM
|
BLD-Framing/Rough-in | 9/20/2001 | 9/20/2001 | 9/20/2001 | P | PART |
Tony Young
|
|
|
###-#### sanela
floor is dug out ok, ok to continue w/ floor joists and decking, verbal conf. on what to do next, elec. complete rouph, etc.///shear is ok also 9/20/2001 12:54:09 PM
|
BLD-Framing/Rough-in | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted, conference on whole project w/ owners,,,partial inspection only 8/23/2001 2:55:01 PM
|
BLD-Conference | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 7/27/2001 4:34:09 PM call rehab @ ###-####///mike met w/ them, paper work for loan is being filled out 7/31/2001 2:33:34 PM
|
BLD-Conference | 7/26/2001 | 7/27/2001 | 7/27/2001 | P | CANC |
Tony Young
|
|
|
7/26/2001 3:39:46 PM
|
BLD-Conference | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | PART |
Tony Young
|
|
|
###-#### call 1st sanla 7/25/2001 2:30:20 PM
need to go back later w/ superviser 7/26/2001 11:10:53 AM
|
BLD-Conference | 7/26/2001 | 7/26/2001 | 7/26/2001 | P | PART |
Tony Young
|
|
|
met w/ bob a./ got 1 set of plans to review and get back w/ them for solution to help them out. 7/26/2001 3:36:30 PM
|
BLD-Footing | 9/6/2000 | 9/8/2000 | 9/8/2000 | A | PART |
|
|
|
Sanela ###-#### met with 415 and homeowners until 6:30 p.m. as they do not speak english this is a difficult project. have confirred with 415 and we will work together to be of service to our customer 9/8/2000 8:51:32 AM
|