BLD-Final | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | NR |
Tom Arcoraci
|
|
|
###-#### ron needs letter from s/i for perm occ 11/20/2001 9:14:53 AM
|
BLD-Final | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PASS |
Jim Sly
|
|
|
###-#### OK for perm Occ. 11/20/2001 3:06:15 PM
|
BLD-Final | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 07:14:13. Contact: ###-####. ok temp oc need all signatures and s-i final letter fire caulk in ele room. 10/26/2001 4:02:38 PM
|
FIRE-Final Inspection | 10/26/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 10/26/2001 8:17:22 AM Buildings "A" and "B" fire alarm, fire sprinkler and life/safety has been inspected and is OK for perm. occ. Building "C" and "D" to be scheduled by contractor
|
FIRE-Final Inspection | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | CANC |
Russ Owen
|
|
|
###-#### ron
|
BLD-Other | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 12:33:48. Contact: ###-####. grid ok in main sales floor. 10/24/2001 2:17:49 PM
|
BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 09:33:23. Contact: ###-####. all c/n items ok ,only new a minimal amount of nails in roof/ wall straps. 9/5/2001 4:03:55 PM
|
BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/23/2001 at 12:29:49. Contact: ###-####.ok to roof pending letter of nailing of wall to roof straps. 8/24/2001 4:11:12 PM
|
BLD-Framing/Rough-in | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/20/2001 at 08:33:40. Contact: ###-####.c/n posted at job trailer. 8/20/2001 3:34:32 PM
|
BLD-Framing/Rough-in | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 10:50:46. Contact: . ok to cover front entry area 8/16/2001 11:43:58 PM
|
BLD-Framing/Rough-in | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 14:36:13. Contact: ###-####.ok to cover metal studs at upper roof,and main entry metal soffit at entry area of arch way only. 8/6/2001 12:20:14 PM
|
BLD-Framing/Rough-in | 8/1/2001 | 8/1/2001 | 8/1/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 10:36:06. Contact: ..need 16ds at 10 oc perimeter of all roof and nails in the wall to truss straps.re -insp req. 8/1/2001 2:27:16 PM
|
BLD-Foundation | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | PART |
Tom Arcoraci
|
|
|
Ron ###-#### spec insp 6/12/2001 10:05:56 PM
|
BLD-Foundation | 6/12/2001 | 6/12/2001 | 6/12/2001 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 07:03:50. Contact: . special inspection required 6/12/2001 11:11:43 AM
|
BLD-Foundation | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/08/2001 at 10:30:36. Contact: ###-####. not ready but special inspection. 1/8/2002 4:00:17 PM
|
BLD-Footing | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | PART |
Dave Hannah
|
|
|
BRYAN ###-#### mti will check rebar befor concrete placement 6/5/2001 11:10:39 AM
|