BLD-Final | 1/16/2001 | 1/17/2001 | 1/17/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 11:32:32. Contact: .Cert. of Comp. issued 1/17/2001 11:50:43 AM
|
BLD-Final | 1/16/2001 | 1/16/2001 | 1/16/2001 | P | CANC |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 1/16/2001 12:36:44 PM Cancelled by contractor, electrical final not completed. 1/16/2001 1:34:57 PM
|
BLD-Energy code compliance | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 11/17/2000
|
BLD-Energy code compliance | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 10:48:37. Contact: .ok to insulate,foam seal ok. no frame c/ns. 11/16/2000 1:39:24 PM
|
BLD-Framing/Rough-in | 11/15/2000 | 11/15/2000 | 11/15/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 10:22:50. Contact: .need to foam and seal no framing c/ns. 11/15/2000 2:58:29 PM
|
BLD-Framing/Rough-in | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 09:05:31. Contact: .c/n posted. 11/14/2000 3:22:37 PM
|
BLD-Wall cover | 11/2/2000 | 11/2/2000 | 11/2/2000 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 09:38:12. Contact: .
|
BLD-Wall cover | 11/1/2000 | 11/1/2000 | 11/1/2000 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 06:22:19. Contact: ###-####.Needs complete set of plans including all attached engineering. 11/3/2000 10:41:25 AM
|
BLD-Footing | 9/21/2000 | 9/21/2000 | 9/21/2000 | P | PART |
Russ Owen
|
|
|
###-####early start 75% complete appears ok. 9/21/2000 2:48:03 PM
|