BLD-Energy code compliance | 1/24/2001 | 1/25/2001 | 1/25/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### call first
|
BLD-Final | 1/25/2001 | 1/25/2001 | 1/25/2001 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/25/2001 11:13:35 AM no sky lights and not restroom vents as per change
|
BLD-Framing/Rough-in | 1/24/2001 | 1/25/2001 | 1/25/2001 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 11/28/2000 | 11/29/2000 | 11/29/2000 | P | PART |
Tony Young
|
|
|
CALL ###-#### FIRST
c/n posted, ok to insulate 11/29/2000 3:03:36 PM
|
BLD-Framing/Rough-in | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | FAIL |
Steven Webb
|
|
|
CLINT- ###-#### FR INSP: Issued c/n. Need approved drawings on site. 11/1/2000 9:54:08 AM
|
BLD-Framing/Rough-in | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | FAIL |
Russ Owen
|
|
|
Clint ###-#### no plans left c/n. 10/30/2000 12:57:25 PM
|
BLD-Framing/Rough-in | 10/25/2000 | 10/27/2000 | 10/27/2000 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 12:35:37. Contact: ###-####. cancelled by contractor. 10/27/2000 10:01:55 AM
|