BLD-Final | 4/10/2001 | 4/10/2001 | 4/10/2001 | P | PASS |
Jim Sly
|
|
|
ED ###-#### access code is 7777 enter C/C issued. 4/10/2001 4:58:48 PM
|
BLD-Energy code compliance | 11/27/2000 | 11/28/2000 | 11/28/2000 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 17:25:17. Contact: .
|
BLD-Wall cover | 11/26/2000 | 11/27/2000 | 11/27/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/26/2000 at 15:09:56. Contact: ###-####. Need to call Energy insp after insul. 11/27/2000 1:59:33 PM
|
BLD-Framing/Rough-in | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 17:33:11. Contact: ###-####.
|
BLD-Foundation | 10/11/2000 | 10/11/2000 | 10/11/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/11/2000 at 06:58:42. Contact: 94118002.
|
BLD-Footing | 10/9/2000 | 10/10/2000 | 10/10/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/09/2000 at 07:32:30. Contact: ###-####. FOR FT INSP
|