BLD-Final | 1/4/2001 | 1/5/2001 | 1/5/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 16:40:31. Contact: ###-####. ok for perm occ 1/5/2001 3:09:39 PM
|
FIRE-Final Inspection | 1/4/2001 | 1/5/2001 | 1/5/2001 | P | PASS |
Joe Tawney
|
|
|
###-####. Reinsp OK for permanant occupancy 1/8/2001 8:07:49 AM
|
Permanent Occupancy | | 1/5/2001 | 1/5/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/3/2001 | 1/4/2001 | 1/4/2001 | A | FAIL |
Joe Tawney
|
|
|
###-####. Final Fail C/N issued 1/5/2001 8:12:02 AM
|
BLD-Other | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 11:27:14. Contact: ###-####. grd ok 12/20/2000 12:05:15 PM
|
BLD-Framing/Rough-in | 12/5/2000 | 12/6/2000 | 12/6/2000 | P | PASS |
Tom Arcoraci
|
|
|
KEITH 206/510/2757 FR 12/6/2000 11:46:06 AM
|