Permit Information
Permit NumberBLD00-02707
StatusFinaled
Name DAN / DIANE WESTON
Site Address 201 E PARKWAY DR
Project Name 
Customer Number342-5642
ePlanReviewNo
Description
To construct a 3066 sq. ft. two story single family dwelling (2243 sq. ft. first floor/823 sq. ft. second floor) with a attached 1062 sq. ft. two car garage/storage and 308 sq. ft. of covered porch. Per approved plans, engineering and requirement list. Resolution 15885 per the council. Tom Cory with Truss Joist designed the connection of the "I" rafters over family room. PC#813 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/9/20015/9/20015/9/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/09/2001 at 10:41:07. Contact: ###-####.
BLD-Energy code compliance12/26/200012/26/200012/26/2000APASS
DetailsJim Storey
Added by Inspector: 301 On 12/26/2000 10:20:51 AM
BLD-Framing/Rough-in12/26/200012/26/200012/26/2000APASS
DetailsJim Storey
Added by Inspector: 301 On 12/26/2000 10:20:22 AM
BLD-Wall cover12/22/200012/26/200012/26/2000ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 12/22/2000 at 18:28:12. Contact: ###-####.
done by 301 12/26/2000 10:17:31 AM
BLD-Wall cover12/21/200012/22/200012/22/2000AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/21/2000 at 15:22:17. Contact: ###-####.unable to locate c/n on site. 12/22/2000 1:59:48 PM
BLD-Framing/Rough-in12/18/200012/19/200012/19/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/18/2000 at 16:11:57. Contact: ###-####. web stifner at entry tji/joist replace garage floor bath 2nd/ fire blk at fire place/ nail girder in gerage north hip/ post to header east girder to header/ header at door at dinning rm hall/ 12/19/2000 9:44:53 AM
BLD-Framing/Rough-in11/29/200011/29/200011/29/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/29/2000 at 10:48:04. Contact: ###-####. exterior sheer pannels ok for cover. 11/29/2000 2:25:51 PM
BLD-Framing/Rough-in11/28/200011/28/200011/28/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/28/2000 at 08:24:27. Contact: ###-####. sheer nailling ok on east and front/ all other nailling missing sole plate and blk. nailling horrisontal. 11/28/2000 4:55:19 PM
BLD-Foundation9/29/20009/29/20009/29/2000PPART
DetailsJim Storey
###-#### would like to pour around 12:30 early start no time to insp ck. setbacks at framing. 9/29/2000 5:51:10 PM
BLD-Footing9/26/20009/27/20009/27/2000APART
DetailsJim Storey
Dan ###-#### check setbacks at wall insp. 9/27/2000 3:42:25 PM
BLD-Footing9/26/20009/26/20009/26/2000PCANC
DetailsJim Storey
Dan Weston ###-####