BLD-Final | 3/28/2001 | 3/29/2001 | 3/29/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### co issued 3/29/2001 3:16:43 PM
|
BLD-Final | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 10:22:14. Contact: ###-####.
|
BLD-Energy code compliance | 1/16/2001 | 1/19/2001 | 1/19/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 13:51:20. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/16/2001 | 1/17/2001 | 1/17/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 13:50:16. Contact: ###-####.ok to insulate c/n on site need two studs under twoply beem back door 1/17/2001 2:31:35 PM
|
BLD-Framing/Rough-in | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PART |
Tom Arcoraci
|
|
|
Mike ###-#### ok to side 1/5/2001 9:48:24 AM
|
BLD-Foundation | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PASS |
Jim Sly
|
|
|
mana ###-####
|
BLD-Footing | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PART |
Jim Sly
|
|
|
ft insp- mike ###-####
|