BLD-Final | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 13:41:15. Contact: ###-####. C. of C. #20114 issued. 2/15/2001 12:17:09 PM
|
BLD-Final | 1/29/2001 | 1/30/2001 | 1/30/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 14:11:21. Contact: ###-####. c/n needs final electrical and window at bottom of stairs required to be tempered by 97 ubc 2406.4.10. 1/30/2001 2:54:47 PM
|
BLD-Framing/Rough-in | 11/21/2000 | 11/22/2000 | 11/22/2000 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 15:06:47. Contact: ###-####.ok to cover, c/n items repaired. 11/22/2000 1:40:43 PM
|
BLD-Framing/Rough-in | 11/17/2000 | 11/20/2000 | 11/20/2000 | P | FAIL |
Steven Webb
|
|
|
JAKE ###-#### FR : c/n issued 11/20/2000 1:12:01 PM
|
BLD-Wall cover | 11/14/2000 | 11/15/2000 | 11/15/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 13:21:34. Contact: ###-####.called contractor. 11/15/2000 1:42:18 PM
|
BLD-Wall cover | 11/8/2000 | 11/9/2000 | 11/9/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/08/2000 at 16:53:44. Contact: ###-####.c/n posted. 11/9/2000 1:55:37 PM
|
BLD-Foundation | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | PASS |
Russ Owen
|
|
|
###-#### after beep 14236 clint found wall
|
BLD-Footing | 10/9/2000 | 10/9/2000 | 10/9/2000 | P | PART |
Russ Owen
|
|
|
jake ###-#### ft setbacks will appear ok.boards not yet up. 10/10/2000 8:42:52 AM 10/10/2000 8:43:20 AM
|