BLD-Final | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | PASS |
Jim Storey
|
|
|
Tina ###-#### l/c final ok. 4/23/2001 9:54:22 AM
|
BLD-Energy code compliance | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | PASS |
Jim Storey
|
|
|
Tina ###-####
|
BLD-Conference | 12/21/2000 | 12/21/2000 | 12/21/2000 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 12/21/2000 10:21:09 AM frame ok pending ele insp ok to insulate.
|
BLD-Framing/Rough-in | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | PASS |
Dave Hannah
|
|
|
shear panel Tina ###-####
|
BLD-Footing | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | PART |
Jim Storey
|
|
|
###-#### ok on lot location early start. 9/28/2000 3:28:04 PM
|