BLD-Final | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 8/1/2001 12:18:05 PM
|
BLD-Energy code compliance | 12/29/2000 | 1/2/2001 | 1/2/2001 | A | PASS |
Tom Arcoraci
|
|
|
craig ###-####
|
BLD-Framing/Rough-in | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok to insul 12/28/2000 10:25:40 AM
|
BLD-Framing/Rough-in | 12/1/2000 | 12/1/2000 | 12/1/2000 | P | PART |
Jim Sly
|
|
|
shear wall inspection ###-#### Shear OK 12/1/2000 4:01:07 PM
|
BLD-Conference | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PASS |
Jim Sly
|
|
|
for conf-- craig ###-#### Discussion of Framing. 11/27/2000 4:40:48 PM
|
BLD-Foundation | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Jim Sly
|
|
|
0 Found wall poured W/O insp. 11/16/2000 3:26:36 PM
|
BLD-Foundation | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Jim Sly
|
|
|
###-#### Called Contr. @ 2:00...No return call...Wall poured W/O insp... 3:10 PM. 11/16/2000 3:28:10 PM
|
BLD-Footing | 11/3/2000 | 11/3/2000 | 11/3/2000 | P | PART |
Jim Sly
|
|
|
ft insp--rod ###-####
|