BLD-Final | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PASS |
Dave Hannah
|
|
|
Johnny ###-####
|
BLD-Energy code compliance | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | NR |
Dave Hannah
|
|
|
JOHNNY ###-#### ENERGY CODE
|
BLD-Energy code compliance | 1/5/2001 | 1/5/2001 | 1/5/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Dave Hannah
|
|
|
FR -JOHNNY ###-####
|
BLD-Framing/Rough-in | 12/20/2000 | 12/20/2000 | 12/20/2000 | P | PASS |
Dave Hannah
|
|
|
SHEAR INSP JOHNNY ###-#### two shear panels by front door will be done after rough elec. panel will on inside walls 12/20/2000 2:05:56 PM
|
BLD-Framing/Rough-in | 12/14/2000 | 12/15/2000 | 12/15/2000 | A | PART |
Dave Hannah
|
|
|
fire wall Johnny ###-#### attic trusses inside layers of 5/8 wallboard ok to set 12/15/2000 10:34:15 AM
|
BLD-Framing/Rough-in | 12/11/2000 | 12/12/2000 | 12/12/2000 | P | PART |
Jim Sly
|
|
|
Johnny ###-#### 1/2 1hr wall....OK 12/12/2000 9:28:11 PM
|
BLD-Foundation | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 12/6/2000 | 12/6/2000 | 12/6/2000 | P | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 12/6/2000 3:11:29 PM
|
BLD-Footing | 12/5/2000 | 12/5/2000 | 12/5/2000 | P | CANC |
Tom Arcoraci
|
|
|
###-####
|