BLD-Final | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | PASS |
Tony Young
|
|
|
Mark ###-#### reinspection
c of c issued, glass behind door is covered by a barrier in place of temp. glass 5/23/2001 1:42:14 PM
|
BLD-Final | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | FAIL |
Tony Young
|
|
|
###-####- mark fn
need s/c door, temp. glass, trade sign off 5/22/2001 2:20:31 PM
|
BLD-Framing/Rough-in | 12/18/2000 | 12/19/2000 | 12/19/2000 | P | PASS |
Tony Young
|
|
|
###-####
ok to insulate, verify energy seal 12/19/2000 4:02:34 PM
|
BLD-Conference | 12/15/2000 | 12/18/2000 | 12/18/2000 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/12/2000 | 12/12/2000 | 12/12/2000 | P | PART |
Tony Young
|
|
|
shear insp ###-####-- mark -- any problems please call
exterior shear ok 12/12/2000 1:16:03 PM
|
BLD-Framing/Rough-in | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | FAIL |
Tony Young
|
|
|
shear Mark ###-####
c/n on shear nailing and hold downs 12/11/2000 2:43:36 PM
|
BLD-Foundation | 10/16/2000 | 10/16/2000 | 10/16/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 08:56:37. Contact: ###-####. WIP OK 10/16/2000 4:23:24 PM
|
BLD-Footing | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | PART |
Tony Young
|
|
|
dave ###-####
wip 10/11/2000 2:59:46 PM
|