BLD-Final | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | PASS |
Dave Hannah
|
|
|
Pj ###-#### 7/26/2001 12:26:01 PM c.c # 20381 issued 7/26/2001 12:32:16 PM
|
BLD-Final | 7/23/2001 | 7/24/2001 | 7/24/2001 | P | FAIL |
Jim Sly
|
|
|
tj ###-#### C/N.....Misc corr. 7/24/2001 4:44:18 PM
|
BLD-Final | 7/19/2001 | 7/19/2001 | 7/19/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### please call before going out 7/19/2001 3:38:14 PM c/n on site 7/19/2001 4:46:04 PM
|
BLD-Final | 6/4/2001 | 6/5/2001 | 6/5/2001 | P | CANC |
Jim Sly
|
|
|
###-#### PJ Smith called in said to cancel inspection.
|
BLD-Aging Inspection | 5/23/2001 | 5/23/2001 | 5/23/2001 | | PART |
Jim Sly
|
|
|
working....Will call for final 5/29..... 5/23/2001 8:51:38 AM
|
BLD-Energy code compliance | 3/22/2001 | 3/23/2001 | 3/23/2001 | A | PASS |
Jim Sly
|
|
|
PJ sMith ###-####
|
BLD-Framing/Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 | P | PASS |
Jim Sly
|
|
|
PJ###-####
|
BLD-Framing/Rough-in | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PASS |
Dave Hannah
|
|
|
pj smith ###-#### fr shear panel ok to cover 3/15/2001 9:56:44 AM
|
BLD-Foundation | 2/23/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/23/2001 at 09:49:00. Contact: ###-####.
|
BLD-Footing | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 07:40:30. Contact: ###-####.
|