BLD-Final | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 1/11/2001 9:18:17 AM refinal w/ clean cert. of compliance
c of c # 19903 issued 1/11/2001 11:11:45 AM
|
BLD-Final | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 16:13:17. Contact: ###-####.
c of c # 19904 issued w/ conditions of drainage from structure, verify achd, zoning, pw sign offs 1/9/2001 10:06:46 AM
|
BLD-Framing/Rough-in | 12/4/2000 | 12/5/2000 | 12/5/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 415 On 12/4/2000 4:31:18 PM interior shear panel, verify energy code compliance paper
|
BLD-Wall cover | 11/29/2000 | 12/4/2000 | 12/4/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 13:23:15. Contact: ###-####. c/n posted 12/4/2000 4:33:33 PM
|
BLD-Energy code compliance | 11/29/2000 | 12/1/2000 | 12/1/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 13:22:28. Contact: ###-####.
energy seal ok 12/1/2000 10:35:44 AM
|
BLD-Framing/Rough-in | 11/29/2000 | 12/1/2000 | 12/1/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 13:21:47. Contact: ###-####.
c/n posted, ok to insulate unaffected areas 12/1/2000 10:33:56 AM
|
BLD-Foundation | 11/13/2000 | 11/14/2000 | 11/14/2000 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 15:33:28. Contact: ###-####.
|
BLD-Footing | 11/9/2000 | 11/9/2000 | 11/9/2000 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 07:24:40. Contact: ###-####.
|
BLD-Footing | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | PART |
Tony Young
|
|
|
Dane ###-####
setbacks are close but look ok so far, work in progress 11/9/2000 1:19:59 PM
|