BLD-Final | 9/28/2001 | 10/1/2001 | 10/1/2001 | A | PASS |
Russ Owen
|
|
|
Craig Hilldebrand, ###-####
|
Permanent Occupancy | | 10/1/2001 | 10/1/2001 | | DONE |
|
|
|
|
BLD-Final | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | PART |
Russ Owen
|
|
|
Ok for temp oc, will require permanent occupancy signatures on the shell and core permit,before issuance of a permant occupancy,also complete t-bar grid correction for perimeter wires and independant light supports, went over this with framing contractor and job suppervisor on 6/25/01. 6/27/2001 10:50:14 AM 6/27/2001 10:53:06 AM 6/27/2001 10:54:47 AM
|
BLD-Final | 6/22/2001 | 6/25/2001 | 6/25/2001 | P | FAIL |
Russ Owen
|
|
|
Aarron ###-#### achd has not signed the card. 6/25/2001 4:15:54 PM
|
FIRE-Final Inspection | 6/22/2001 | 6/25/2001 | 6/25/2001 | A | PASS |
Rick Jackson
|
|
|
Aarron ###-####
|
FIRE-Alarm Testing | 6/20/2001 | 6/21/2001 | 6/21/2001 | P | CANC |
Joe Tawney
|
|
|
Cancel wrong permit number 6/20/2001 2:04:07 PM
|
FIRE-Final Inspection | 6/20/2001 | 6/21/2001 | 6/21/2001 | P | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 6/21/2001 3:42:40 PM
|
FIRE-Conference | 6/8/2001 | 6/11/2001 | 6/11/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Conf with contr on TI. Advised he needed to get final on shell BLD00-02307 before TI could be signed off 6/11/2001 11:31:39 AM
|
FIRE-Conference | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | CANC |
Joe Tawney
|
|
|
Cancel To be rescheduled for 6/8/01 6/7/2001 3:50:50 PM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Russ Owen
|
|
|
Arron ###-####ok to sheetrock. 3/30/2001 11:57:22 AM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 14:55:54. Contact: ###-####.
|