BLD-Final | 5/10/2001 | 5/11/2001 | 5/11/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 22:49:07. Contact: ###-####. insulate rim joist,temp glass at lower stairs,fire calk garage wall,drainage required away also containment. c/n posted. 12/11/2001 11:33:11 AM
|
BLD-Final | 5/11/2001 | 5/11/2001 | 5/11/2001 | P | CANC |
Russ Owen
|
|
|
###-#### transfer to 301 12/11/2001 4:22:07 PM
|
BLD-Final | 5/11/2001 | 5/11/2001 | 5/11/2001 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 5/11/2001 3:23:32 PM LC ISSUED
|
BLD-Energy code compliance | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 22:54:08. Contact: ###-####.
|
BLD-Energy code compliance | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 22:54:08. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 22:53:31. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 22:53:31. Contact: ###-####. need to verify sheetrock at ext wall in upper floor return chase through the vent. 4/4/2001 2:09:45 PM
|
BLD-Framing/Rough-in | 4/1/2001 | 4/2/2001 | 4/2/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/01/2001 at 22:22:26. Contact: ###-####. ok to in sulate c/n posted. 4/2/2001 3:57:05 PM
|
BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PASS |
Russ Owen
|
|
|
###-####ok to side 2/5/2001 12:29:28 PM
|
BLD-Foundation | 11/12/2000 | 11/13/2000 | 11/13/2000 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/12/2000 at 17:09:56. Contact: ###-####.
|
BLD-Footing | 11/7/2000 | 11/8/2000 | 11/8/2000 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/07/2000 at 13:33:25. Contact: ###-####.
|