BLD-Final | 1/9/2001 | 1/10/2001 | 1/10/2001 | P | PASS |
Russ Owen
|
|
|
john ###-#### fn occ
|
BLD-Energy code compliance | 11/17/2000 | 11/27/2000 | 11/27/2000 | P | PART |
Carl Dependahl
|
|
|
john ###-#### energy code; c/n ok. 11/27/2000 4:23:06 PM
|
BLD-Framing/Rough-in | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/27/2000 4:23:54 PM ok to cover
|
BLD-Framing/Rough-in | 11/17/2000 | 11/22/2000 | 11/22/2000 | P | PART |
Dave Hannah
|
|
|
john ###-#### fr insp ok to insulate
11/22/2000 4:06:44 PM
|
BLD-Framing/Rough-in | 11/17/2000 | 11/20/2000 | 11/20/2000 | A | PART |
Tom Arcoraci
|
|
|
shear nail --john-- ###-#### ok to sid 11/20/2000 8:57:53 AM ok to side 11/20/2000 8:58:17 AM
|
BLD-Foundation | 10/30/2000 | 10/30/2000 | 10/30/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 07:20:12. Contact: .
|
BLD-Footing | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | PART |
Tom Arcoraci
|
|
|
Jerry ###-#### 1:30 if possible mudd is coming at that time
|