BLD-Final | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Russ Owen
|
|
|
Michael ###-####
|
BLD-Final | 1/3/2001 | 1/4/2001 | 1/4/2001 | P | FAIL |
Russ Owen
|
|
|
c/n posted. 1/4/2001 2:20:31 PM
|
BLD-Energy code compliance | 12/8/2000 | 12/11/2000 | 12/11/2000 | A | PASS |
Russ Owen
|
|
|
MIKE ###-#### ENERGY CODE
|
BLD-Framing/Rough-in | 12/12/2000 | 12/11/2000 | 12/11/2000 | P | PART |
Russ Owen
|
|
|
OK
|
BLD-Framing/Rough-in | 12/8/2000 | 12/11/2000 | 12/11/2000 | A | FAIL |
Russ Owen
|
|
|
FR INSP MIKE- ###-####stairs c/n 12/11/2000 12:21:27 PM
|
BLD-Energy code compliance | 12/5/2000 | 12/8/2000 | 12/8/2000 | P | NR |
Russ Owen
|
|
|
###-####not ready for inulation inspection at this time 12/8/2000 3:38:17 PM
|
BLD-Framing/Rough-in | 12/8/2000 | 12/8/2000 | 12/8/2000 | P | FAIL |
Russ Owen
|
|
|
MIKE FR c/n posted. 12/8/2000 3:37:24 PM
|
BLD-Framing/Rough-in | 12/5/2000 | 12/8/2000 | 12/8/2000 | A | FAIL |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | PART |
Tom Arcoraci
|
|
|
adam ###-#### stem wall
|
BLD-Footing | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 08:14:14. Contact: ###-####.
|
BLD-Footing | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 09:37:53. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/16/2000 at 09:42:14.
|