BLD-Final | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PASS |
Tony Young
|
|
|
c of c #20321 issued 5/8/2001 12:15:05 PM
|
BLD-Final | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | FAIL |
Tony Young
|
|
|
###-####
c/n posted 5/7/2001 2:23:43 PM
|
BLD-Grading Inspection | 5/7/2001 | 5/7/2001 | 5/7/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
BLD-Energy code compliance | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 2/14/2001 11:28:21 AM
|
BLD-Framing/Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | CANC |
Dave Hannah
|
|
|
###-#### CALL FIRST
|
BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | FAIL |
Tony Young
|
|
|
FR GLENN-- ###-#### -CALL 1ST BEFORE INSP
c/n still posted, need to meet eng. on site 2/9/2001 11:53:37 AM
|
BLD-Framing/Rough-in | 2/7/2001 | 2/8/2001 | 2/8/2001 | P | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/1/2001 | 2/1/2001 | 2/1/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### cn posted have eng ok all of his eng systems for correct installtion 2/1/2001 5:12:37 PM
|
BLD-Other | 1/29/2001 | 1/31/2001 | 1/31/2001 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 13:10:19. Contact: ###-####.called left msg, no response. unsure what needed?? 1/31/2001 3:06:23 PM
|
BLD-Foundation | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | PART |
Dave Hannah
|
|
|
found wall-- ###-####- robert
|
BLD-Footing | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 09:42:10. Contact: ###-####.
|