BLD-Conference | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | PASS |
Jim Storey
|
|
|
###-#### steve cole
|
BLD-Final | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | PASS |
Jim Storey
|
|
|
steve ###-####
|
BLD-Conference | 1/13/2003 | 1/13/2003 | 1/13/2003 | P | PASS |
Jim Storey
|
|
|
STEVEN ###-#### JIM, THIS INSPECTION IS TO EXTEND THE PERMIT wip plumbing ri in progess. 1/13/2003 12:09:56 PM
|
Extend Permit 180 days | | 1/13/2003 | 1/13/2003 | | DONE |
|
|
|
per Jim Storey
|
BLD-Final | 1/6/2003 | 1/10/2003 | 1/8/2003 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 13:42:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/08/2003 at 09:34:59.
|
BLD-Conference | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | PASS |
Jim Storey
|
|
|
steven ###-#### dry wall stage steven home owner ok to extend 180 days wip will be done well befre experition of extention. ###-#### dry wall stage 6/12/2002 2:38:18 PM
|
BLD-Framing/Rough-in | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 12:23:41. Contact: ###-####. exterior ok for cover. 10/24/2001 11:14:20 AM
|
BLD-Concrete | 4/16/2001 | 4/17/2001 | 4/17/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 16:49:04. Contact: ###-####. house addition ok for monolithic pour. 4/17/2001 1:40:18 PM
|
BLD-Footing | 11/2/2000 | 11/2/2000 | 11/2/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### ft wall poured mono slab to be poured after plumbing installed 11/2/2000 3:34:02 PM
|