BLD-Final | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | PASS |
Tom Arcoraci
|
|
|
Bill, ###-#### - call before going out ok for perm occ 9/24/2001 4:17:22 PM
|
Permanent Occupancy | | 9/24/2001 | 9/24/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PASS |
Joe Tawney
|
|
|
REinsp OK for permanant occupancy 8/20/2001 11:54:47 AM
|
FIRE-Final Inspection | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | FAIL |
Joe Tawney
|
|
|
Reinsp Fail Modify supply registers in several rooms so air does not blow on detectors that are within 3 ft 8/16/2001 3:20:31 PM
|
BLD-Final | 7/27/2001 | 7/30/2001 | 7/30/2001 | P | PASS |
Tom Arcoraci
|
|
|
Bill ###-#### ok for temp perm ok when others sign perm 7/30/2001 3:47:26 AM
|
BLD-Final | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | NR |
Tom Arcoraci
|
|
|
as late as possible Bill ###-####
|
FIRE-Final Inspection | 7/24/2001 | 7/24/2001 | 7/24/2001 | P | PART |
Joe Tawney
|
|
|
###-#### Final OK for temp occupancy. Provide air registers to keep air from blowing on detectors 7/24/2001 4:00:34 PM
|
BLD-Final | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | NR |
Tom Arcoraci
|
|
|
###-#### needs achd to sign 7/6/2001 2:38:40 AM
|
FIRE-Final Inspection | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | CANC |
Joe Tawney
|
|
|
Cancel To be rescheduled 7/3/2001 11:01:41 AM
|
BLD-Framing/Rough-in | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | PASS |
Tom Arcoraci
|
|
|
nailing sheet rock 1st floor inspection Bill ###-####
|
BLD-Framing/Rough-in | 5/11/2001 | 5/14/2001 | 5/14/2001 | A | PASS |
Dave Hannah
|
|
|
Bill ###-#### nailing on drywall second floor ok to tape 5/14/2001 11:34:11 AM
|
BLD-Framing/Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Tom Arcoraci
|
|
|
fire wall early pm Darrel ###-#### ok to cover 5/8/2001 4:26:44 PM
|
BLD-Energy code compliance | 5/2/2001 | 5/3/2001 | 5/3/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Energy code compliance | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | FAIL |
Alan Hauser
|
|
|
no insulation at the waterlines for washers, these are in exterior walls 5/2/2001 3:17:05 PM
|
BLD-Framing/Rough-in | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | PASS |
Tom Arcoraci
|
|
|
call 1st before insp-- paul --###-#### fr
|
BLD-Framing/Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | NR |
Tom Arcoraci
|
|
|
fr insp paul- ###-#### --call 1st before insp please
|
BLD-Framing/Rough-in | 3/28/2001 | 3/29/2001 | 3/29/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 17:14:59. Contact: ###-####. contractor conc look at tjis that plumber cut they are gining to sister new tjis along side ones that have been cut 3/29/2001 11:06:28 AM
|
BLD-Framing/Rough-in | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### ok to side south building 2/27/2001 2:54:02 PM
|
BLD-Foundation | 1/18/2001 | 1/19/2001 | 1/19/2001 | A | PART |
Dave Hannah
|
|
|
Kurt ###-####
|
BLD-Footing | 1/16/2001 | 1/17/2001 | 1/17/2001 | A | PART |
Russ Owen
|
|
|
###-#### wip. 1/17/2001 11:30:34 AM
|