Permit Information
Permit NumberBLD00-03048
StatusFinaled
Name SEVERN, WINKLE & MAGETTE
Site Address 205 N 10TH ST Unit: (3RD FLR)
Project NameEMPIRE BLDG-3RD FLR
Customer Number 
ePlanReviewNo
Description
(SEVERN, WINKLE & MAGETTE) This building is fire sprinklered, under the provisions of the 1994 UCBC, to allow it to be too tall, too big, and have too many stories. To construct a 7,745 square foot office tenant on the 3rd floor of an existing historic building. This tenant will occupy the entire 3 floor. Work to include interior nonbearing walls, interior doors, suspended ceilings, millwork, and interior finishes all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-845-00 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 1/8/20011/8/2001 DONE
Details
BLD-Conference1/4/20011/4/20011/4/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/4/2001 6:02:12 PM keep cn
BLD-Final12/26/200012/26/200012/26/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2000 at 07:54:17. Contact: ###-####.
BLD-Final12/26/200012/26/200012/26/2000PPART
DetailsJim Storey
###-#### perm occ ok pending plm sign off. 12/26/2000 4:07:22 PM
BLD-Final12/26/200012/26/200012/26/2000PPASS
DetailsJim Storey
Added by Inspector: 301 On 12/26/2000 4:09:03 PM final ok c/o
FIRE-Final Inspection12/22/200012/22/200012/26/2000PPASS
DetailsRick Jackson
FIRE FN ED ###-####
BLD-Conference12/20/200012/20/200012/20/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/20/2000 5:29:14 PM w/ ed at site
BLD-Conference12/20/200012/20/200012/20/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/20/2000 5:29:14 PM w/ ed at site
BLD-Framing/Rough-in12/18/200012/19/200012/19/2000APART
DetailsCarl Dependahl
###-#### ceiling grid, interior offices 12/19/2000 2:21:26 PM
BLD-Other12/14/200012/15/200012/15/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/14/2000 at 13:50:35. Contact: ###-####.perim office lids 12/15/2000 3:12:25 PM
BLD-Framing/Rough-in12/12/200012/13/200012/13/2000APART
DetailsCarl Dependahl
ABOVE CEILING INSP-- BOB ###-#### c/n ok for wire wraps 12/13/2000 12:09:17 PM
BLD-Framing/Rough-in12/11/200012/12/200012/12/2000AFAIL
DetailsCarl Dependahl
bob-- ###-#### ceiling grid, c/n wire wraps 12/12/2000 10:29:36 AM