BLD-Final | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | PASS |
Alan Hauser
|
|
|
c/c#19285 3/27/2001 11:51:05 AM
|
BLD-Energy code compliance | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 11:32:12. Contact: ###-####. 1/5/2001 10:00:57 AM
|
BLD-Wall cover | 12/14/2000 | 12/15/2000 | 12/15/2000 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/14/2000 at 11:28:31. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/15/2000 at 07:24:20.
|
BLD-Wall cover | 12/15/2000 | 12/15/2000 | 12/15/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/15/2000 at 07:23:10. Contact: ###-####. Shear OK. 12/15/2000 12:49:44 PM
|
BLD-Foundation | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | PART |
Dave Hannah
|
|
|
Ryan ###-####
|
BLD-Footing | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Jim Sly
|
|
|
###-####
|