BLD-Final | 3/7/2001 | 3/8/2001 | 3/8/2001 | A | PASS |
Jim Storey
|
|
|
###-#### Rocky
|
FIRE-Final Inspection | 3/7/2001 | 3/8/2001 | 3/8/2001 | P | PASS |
Rick Jackson
|
|
|
Rocky ###-####
|
Permanent Occupancy | | 3/8/2001 | 3/8/2001 | | DONE |
|
|
|
|
BLD-Final | 3/6/2001 | 3/7/2001 | 3/7/2001 | P | CANC |
Jim Storey
|
|
|
ROCKY ###-#### FN OCC\\FIRE DID NOT PASS
|
FIRE-Final Inspection | 3/6/2001 | 3/7/2001 | 3/7/2001 | A | FAIL |
Rick Jackson
|
|
|
FIRE FN ROCKY ###-#### CELL-- need duct detector connected to fire panel and remote LED on ceiling 3/7/2001 8:51:16 AM
|
BLD-Final | 3/5/2001 | 3/6/2001 | 3/6/2001 | P | NR |
Dave Hannah
|
|
|
###-#### need fire life safty final 3/6/2001 2:00:16 PM
|
BLD-Framing/Rough-in | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | NR |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/21/2001 4:19:51 PM gave to 301... called bldr.
|
BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/20/2001 5:29:08 PM W/ CONTRACTOR...RECALL; I'LL INFORM 301
|
BLD-Framing/Rough-in | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 10:21:04. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/25/2001 | 1/26/2001 | 1/26/2001 | P | PART |
Carl Dependahl
|
|
|
grid inspection jack ###-####9, part, add spreaders. 1/26/2001 5:26:20 PM
|
BLD-Framing/Rough-in | 1/17/2001 | 1/18/2001 | 1/18/2001 | P | PART |
Jim Storey
|
|
|
###-#### late pm tennent walls and one bathroom ok.no ele or plm in tenent walls. 1/18/2001 4:13:46 PM
|