BLD-Final | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### GARAGE 7550, c/n ok, l/c issued 3/22/2001 4:05:28 PM
|
BLD-Final | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | FAIL |
Steven Webb
|
|
|
C/N issued-lower stairs handrail exceeds code for height, insulation needed against rim joist in crawl. 3/15/2001 11:05:35 AM
|
BLD-Framing/Rough-in | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Steven Webb
|
|
|
Troy ###-#### energy-ok to cover, energy report prior to c. of o. issuance. 1/5/2001 10:33:04 AM
|
BLD-Conference | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 1/4/2001 2:56:14 PM Reviewed prior c/n provided recommendations for action needed to comply with codes.
|
BLD-Framing/Rough-in | 1/3/2001 | 1/4/2001 | 1/4/2001 | A | CANC |
Steven Webb
|
|
|
FR INSP TROY ###-####: Inspector 301 did pm of 1/3/2001 1/4/2001 8:19:15 AM
|
BLD-Framing/Rough-in | 12/18/2000 | 12/18/2000 | 12/18/2000 | P | PASS |
Steven Webb
|
|
|
shear wall ###-#### troy
|
BLD-Framing/Rough-in | 12/11/2000 | 12/12/2000 | 12/12/2000 | A | NR |
Carl Dependahl
|
|
|
Troy ###-####; not a frame insp...need details for stairs; conf only 12/12/2000 1:50:34 PM
|
BLD-Conference | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/7/2000 4:26:30 PM w/bldr re plan chk...ok as existing condition, bldg upgrade on file
|
BLD-Conference | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/20/2000 5:15:13 PM w jason b re plan reqs
|
BLD-Foundation | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | PART |
Russ Owen
|
|
|
found wall- mana- ###-#### about 70 percent complete.work ok. 11/3/2000 10:46:01 AM
|
BLD-Footing | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | PART |
Russ Owen
|
|
|
ft insp chris ###-#### about 50 percent complete. 11/1/2000 8:45:41 AM
|