BLD-Final | 4/21/2004 | 4/21/2004 | 4/21/2004 | P | FAIL |
Russ Owen
|
|
|
###-#### steve. NOTE: See history of prior inspections, I have requested direction from my suppervisors on this, via E-mailed as to how to address the bedroom window issue. This existing bedroom is clearly indicated on the approved plans . Also there are other items, need exterior window trim,crawl space perimeter insulation,there is a portion of the foundation vent located under the exterior doorway that needs to be filled in, and the mechanical permit is not finaled, there is uninsulated flex duct ran to the underfloor heat boots and bathroom is not connected to duct. 4/21/2004 12:55:48 AM 4/21/2004 12:57:16 AM 4/21/2004 12:59:44 AM
|
BLD-Framing/Rough-in | 4/18/2002 | 4/19/2002 | 4/19/2002 | P | PASS |
Dave Hannah
|
|
|
STEVE ###-#### ok to cover 4/19/2002 3:16:03 PM
|
BLD-Framing/Rough-in | 11/20/2001 | 11/21/2001 | 11/21/2001 | A | PART |
Dave Hannah
|
|
|
fr insp- steve- ###-#### for homeowner ok to insulate but still needs plumbimg r i 11/21/2001 9:37:28 AM
|
BLD-Framing/Rough-in | 8/31/2001 | 9/4/2001 | 9/4/2001 | A | PART |
Russ Owen
|
|
|
###-#### . Owner wanted a conference about existing bedroom having no direct egress exit to exterior,as shown on approved plans. And This was not identified by a plan reveiw. The bedroom is surrounded by other areas at 3 sides, and the existing egress window is now located in the new addition, I have no solution for this, as bedrooms require egress widows. And owner does not want to turn this area into a office/den ?. As built there is no way to comply with code. At this time the job is not ready for a framing inspection. Recomended to owner, to seek addl help and or plan modification from plan reveiw or a suppervisor. 9/4/2001 11:42:44 AM 9/4/2001 11:44:48 AM
|
BLD-Framing/Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | PASS |
Dave Hannah
|
|
|
STeve ###-#### 5/17/2001 2:23:33 PM shear nailing and roof ok to cover 5/17/2001 3:55:27 PM
|
BLD-Foundation | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | PASS |
Dave Hannah
|
|
|
###-#### plans on site
|
BLD-Footing | 11/30/2000 | 12/1/2000 | 12/1/2000 | A | NR |
Dave Hannah
|
|
|
FT -STEVE ###-#### CELL
|
BLD-Footing | 12/1/2000 | 12/1/2000 | 12/1/2000 | P | PART |
Dave Hannah
|
|
|
FT -RE-INSP- STEVE ###-####
|