BLD-Conference | 6/11/2002 | 6/11/2002 | 6/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
JUST NEEDS TO BE DOC FINALED PLEASE
|
BLD-Final | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 08:07:23. Contact: ###-####. lc issued 8/2/2001 3:29:44 AM
|
BLD-Final | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### reinspectionneeds garage door hardware and seal. 7/30/2001 3:42:17 PM
|
BLD-Final | 7/25/2001 | 7/25/2001 | 7/25/2001 | P | FAIL |
Tom Arcoraci
|
|
|
bob ###-#### c/n posted on window 7/25/2001 2:08:57 AM
|
BLD-Energy code compliance | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/11/2001 4:37:47 PM
|
BLD-Framing/Rough-in | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | PASS |
Tom Arcoraci
|
|
|
bob ###-#### reinspection
|
BLD-Framing/Rough-in | 4/5/2001 | 4/6/2001 | 4/6/2001 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### no plans 4/6/2001 10:40:25 AM
|
BLD-Final | 3/30/2001 | 3/30/2001 | 3/30/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 07:29:55. Contact: ###-####. called wrong insp in. 3/30/2001 2:08:41 PM
|
BLD-Framing/Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### shear wall
|
BLD-Framing/Rough-in | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | NR |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 3/26/2001 1:03:16 PM
|
BLD-Framing/Rough-in | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | PART |
Tom Arcoraci
|
|
|
SHEAR WALL ###-#### ok to side all but rear bays needs floor to floor straps ext hds 3/5/2001 2:06:36 PM
|
BLD-Framing/Rough-in | 2/23/2001 | 2/26/2001 | 2/26/2001 | A | PART |
Russ Owen
|
|
|
###-####firewall upper 2/26/2001 10:46:53 AM
|
BLD-Footing | 12/28/2000 | 12/28/2000 | 12/28/2000 | P | PASS |
Tom Arcoraci
|
|
|
FT INSP ROD-- ###-####
|