BLD-Final | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 10:41:12. Contact: ###-####.
|
BLD-Final | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 15:37:26. Contact: ###-####.struct items ok, rec'd eng's letter...need p& z. 4/27/2001 10:07:48 AM
|
BLD-Final | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | FAIL |
Carl Dependahl
|
|
|
herb ###-####, c/n rails, firestops a bs mt lid, etc 4/17/2001 5:43:19 PM 4/17/2001 5:44:10 PM
|
FIRE-Final Inspection | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Rick Jackson
|
|
|
Herb ###-####
|
BLD-Conference | 4/10/2001 | 4/10/2001 | 4/10/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/10/2001 9:28:57 AM w/ Herb of K2...need to install int shear or???
|
BLD-Framing/Rough-in | 3/2/2001 | 3/5/2001 | 3/5/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 10:15:19. Contact: ###-####....c/n fireblocks,, bsmt lid firestops, draft stop, shear walls (SW3) 3/5/2001 12:32:11 PM
|
BLD-Conference | 2/23/2001 | 2/23/2001 | 2/23/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/23/2001 9:48:08 AM w/ K-2 re truss components...ok per letter
|
BLD-Framing/Rough-in | 2/20/2001 | 2/22/2001 | 2/22/2001 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 09:22:39. Contact: ###-####. canc by superintendent 2/22/2001 4:10:35 PM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 2/20/2001 3:36:17 PM ok to sheetrock basement
|
BLD-Conference | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/13/2001 2:46:47 PM #1 ok for truss bottom chord
|
BLD-Framing/Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/6/2001 10:23:33 AM trusses a-1 a & b req 2100 psi bottom chords, verify
|
BLD-Conference | 2/2/2001 | 2/2/2001 | 2/2/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/2/2001 8:53:37 AM w/bldr re nailing insp
|
BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 14:38:01. Contact: ###-####.
exterior shear ok, some minor verbal corrections on nailing to double studs at hold downs 2/2/2001 12:23:39 PM
|
BLD-Conference | 1/24/2001 | 1/24/2001 | 1/24/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/24/2001 9:32:55 AM w Herb re trusses, ok to submit onsite at frame insp
|
BLD-Foundation | 1/16/2001 | 1/16/2001 | 1/16/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 10:21:26. Contact: ###-####.
already poured/ meant to call in other permit # @ 2717 w. bannock 1/16/2001 2:04:18 PM
|
BLD-Foundation | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 09:05:15. Contact: ###-####. bsmt walls ok. 1/11/2001 5:16:10 PM
|
BLD-Footing | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 13:17:11. Contact: ###-####. ftgs ok, steel in place 1/5/2001 3:13:14 PM
|
BLD-Conference | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/4/2001 6:04:28 PM w/ bldr, soils report pending
|