FIRE-Final Inspection | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PASS |
Joe Tawney
|
|
|
Jim ###-#### Reinsp OK for permanant occupancy 4/4/2001 12:41:24 PM
|
Permanent Occupancy | | 4/4/2001 | 4/4/2001 | | DONE |
|
|
|
|
BLD-Final | 4/2/2001 | 4/3/2001 | 4/3/2001 | P | NR |
Russ Owen
|
|
|
###-#### needs fire/life safety insp. 4/3/2001 5:04:09 PM
|
FIRE-Final Inspection | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail exit doors 4/3/2001 12:53:00 PM
|
BLD-Framing/Rough-in | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | PASS |
Russ Owen
|
|
|
ceiling grid ###-####
|
BLD-Framing/Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 | P | PASS |
Russ Owen
|
|
|
###-####canopy at the front. 3/21/2001 4:16:14 PM
|
BLD-Framing/Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Concrete | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | PART |
Tom Arcoraci
|
|
|
REBAR\\###-#### subject to spec insp 3/1/2001 9:57:18 AM
|
BLD-Concrete | 2/26/2001 | 2/26/2001 | 2/26/2001 | P | PART |
Russ Owen
|
|
|
###-####subject to S-I. 2/26/2001 3:51:35 PM
|
BLD-Concrete | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | PART |
Russ Owen
|
|
|
###-####masonry insp subject to s-i. 2/22/2001 9:45:06 AM
|
BLD-Concrete | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | PART |
Russ Owen
|
|
|
###-#### block wall,subject to si. 2/20/2001 1:50:58 PM
|
BLD-Concrete | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PART |
Russ Owen
|
|
|
###-#### S-I required inspection. 2/15/2001 12:27:16 PM
|
BLD-Foundation | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Dave Hannah
|
|
|
###-#### Jim floor slab crew is working on slab spec insp will beon site tomorrow for final and test conc. 1/10/2001 2:30:14 PM
|
BLD-Foundation | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | PART |
Alan Hauser
|
|
|
special inspection 1/3/2001 12:07:15 PM
|
BLD-Footing | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | PART |
Tom Arcoraci
|
|
|
FT JIM ###-#### wip spec on site strata 12/22/2000 8:29:14 AM
|