BLD-Final | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 11:13:07. Contact: ###-####. C. of C. issued. 3/28/2001 3:41:02 PM
|
BLD-Final | 3/27/2001 | 3/27/2001 | 3/27/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 07:23:25. Contact: ###-####. C/n posted-landing outside b.room, attic access sealed in garage. 3/27/2001 9:02:00 AM
|
BLD-Energy code compliance | 1/30/2001 | 1/30/2001 | 1/30/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 06:58:21. Contact: ###-####.ok to cover 1/30/2001 4:09:49 PM
|
BLD-Framing/Rough-in | 1/26/2001 | 1/26/2001 | 1/26/2001 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 11:06:54. Contact: ###-####.
420 took 4 me 1/26/2001 1:58:27 PM
|
BLD-Framing/Rough-in | 1/26/2001 | 1/26/2001 | 1/26/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 1/26/2001 2:23:52 PM c/n issued, 1) Fireblocks needed at stairs, 2) Front SW bedroom needs straps on each side (above black arrows) of pop out on double top plates, 3) Front SW bedroom needs header according to plans or provide engineering, 4) Post address according to permit conditions number 9. Ok to insulate. 1/26/2001 3:18:26 PM
|
BLD-Framing/Rough-in | 1/16/2001 | 1/16/2001 | 1/16/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 06:53:23. Contact: ###-####. Shear--ok to side. 1/16/2001 11:47:37 AM
|
BLD-Foundation | 12/22/2000 | 12/26/2000 | 12/26/2000 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 11:02:23. Contact: ###-####.
|
BLD-Footing | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 11:38:45. Contact: ###-####.
|