Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03204
StatusFinaled
Name CASITAS NORTE APARTMENTS
Site Address 4967 W STOKER LN
Project NameCASITAS NORTE APT.
Customer Number 
ePlanReviewNo
Description
BUILDING TYPE A * TO CONSTRUCT A NEW 3,880 SQ.FT. TWO STORY, FOUR UNIT APARTMENT BUILING. THE FIRST FLOOR IS 2,220 SQ.FT AND THE SECOND FLOOR IS 2.100 SQ.FT. EACH UNIT IS 970 SQ.FT. TWO BEDROOMS, TWO BATH WITH A 60 SQ.FT DECK. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST. DRH99-0098 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/15/20037/16/20037/16/2003ADONE
DetailsSteven Webb
BLD-Aging Inspection7/11/20037/11/20037/11/2003 CANC
DetailsTony Young
FIRE-Final Inspection5/5/20035/5/20035/5/2003PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Aging Inspection4/8/20034/8/20034/8/2003 PASS
DetailsTony Young
Permanent Occupancy 4/8/20034/8/2003 DONE
Details
BLD-Conference2/5/20032/6/20032/6/2003ACANC
DetailsTony Young
per tom moore
BLD-Final2/5/20032/6/20032/6/2003PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 02/05/2003 at 17:29:37. Contact: ###-####.
ok for temp. occ. untill all trades are ok 2/6/2003 2:02:15 PM
BLD-Other2/5/20032/6/20032/6/2003ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 02/05/2003 at 17:29:04. Contact: ###-####.cancel per tom moore
BLD-Final2/5/20032/5/20032/5/2003PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 02/05/2003 at 00:13:49. Contact: ###-####.
FIRE-Final Inspection2/5/20032/5/20032/5/2003APART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Millers permission until the curb painting could be done
BLD-Aging Inspection12/11/200212/11/200212/11/2002 PASS
DetailsTony Young
still working on 12/18/2002 8:03:34 AM
BLD-Energy code compliance7/19/20027/19/20027/19/2002PPASS
DetailsTony Young
jeff- ###-####
BLD-Framing/Rough-in7/12/20027/12/20027/12/2002PPART
DetailsTony Young
###-####
c/n,,, ok to insulate 7/15/2002 7:57:21 AM
BLD-Framing/Rough-in7/2/20027/5/20027/5/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 07/02/2002 at 11:20:16. Contact: ###-####.c/n posted 7/5/2002 10:52:30 AM
BLD-Framing/Rough-in7/1/20027/2/20027/2/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 07/01/2002 at 16:37:21. Contact: ###-####.ok to insulate 7/2/2002 10:13:51 AM
BLD-Framing/Rough-in6/28/20027/1/20027/1/2002ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 06/28/2002 at 14:08:40. Contact: ###-####.
BLD-Framing/Rough-in5/16/20025/17/20025/17/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/16/2002 at 13:44:17. Contact: ###-####.
ext shear ok 5/17/2002 10:39:01 AM
BLD-Framing/Rough-in5/2/20025/3/20025/3/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/02/2002 at 12:57:41. Contact: ###-####.
off of north st 5/2/2002 1:55:51 PMpre-inspection only will need to recall. 5/3/2002 6:36:42 PM
BLD-Foundation3/19/20023/20/20023/20/2002APART
DetailsTony Young
dane- ###-#### found
staff meeting this morning, cont. called and said truck was there, told him to pour at his risk, so far all has been ok on this project 3/20/2002 11:29:18 AM
BLD-Footing3/15/20023/18/20023/18/2002ANR
DetailsTony Young
###-#### manu
BLD-Footing3/18/20023/18/20023/18/2002PPART
DetailsTony Young
manual 941- 1805 3/18/2002 9:07:54 AM
BLD-Foundation3/12/20023/12/20023/12/2002ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 03/12/2002 at 06:49:38. Contact: ###-####.
BLD-Conference3/5/20023/6/20023/6/2002APART
DetailsTony Young
###-#### tom look at revision on hds 3/5/2002 2:05:03 PMok for alt. engineering on hds/ shear 3/6/2002 2:17:39 PM
BLD-Conference3/4/20023/5/20023/5/2002APART
DetailsTony Young
###-#### TOM ###-####
ok for alt. hds/shear per new engineering 3/6/2002 2:18:25 PM