BLD-Final | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PASS |
Jim Sly
|
|
|
weather protected outlet has the key in it ###-#### C/C issued. 5/14/2001 4:59:31 PM
|
BLD-Final | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | NR |
Jim Sly
|
|
|
KEY IN THE WEATER PROTECTIVE OUTLET ON THE FRONT OF HOUSE JOE ###-#### No Key in Outlet.
5/8/2001 3:02:35 PM
|
BLD-Energy code compliance | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 1/5/2001 | 1/5/2001 | 1/5/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 08:13:06. Contact: . all items on org. c/n not done 1/5/2001 2:41:38 PM
|
BLD-Framing/Rough-in | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | FAIL |
Russ Owen
|
|
|
JOE ###-####c/n posted. 12/29/2000 10:21:20 AM
|
BLD-Framing/Rough-in | 12/8/2000 | 12/11/2000 | 12/11/2000 | A | PART |
Jim Sly
|
|
|
SHEAR-- ###-#### Shear OK 12/11/2000 12:05:32 PM
|
BLD-Footing | 11/9/2000 | 11/13/2000 | 11/13/2000 | A | PART |
Tom Arcoraci
|
|
|
pat ###-#### apps ok
11/13/2000 10:05:21 AM
|