BLD-Aging Inspection | 5/20/2003 | 5/20/2003 | 5/20/2003 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/18/2003 | 3/19/2003 | 3/19/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/18/2003 at 2:35:19 PM. Contact: ###-####.ok for perm occ 3/19/2003 2:26:53 PM
|
BLD-Conference | 3/14/2003 | 3/14/2003 | 3/14/2003 | P | DONE |
Dave Hannah
|
|
|
meeting at 2 pm, to meet in lobby of plaza 1, i think this is 400 park
|
BLD-Aging Inspection | 3/13/2003 | 3/13/2003 | 3/13/2003 | | PASS |
Dave Hannah
|
|
|
Tony will schedule final next week 3/13/2003 11:35:08 AM
|
FIRE-Final Inspection | 4/23/2001 | 4/24/2001 | 4/24/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/23/2001 at 14:52:26. Contact: ###-####. penetrations at corridor will be verified and completed for structural inspector 4/24/2001 10:23:09 AM
|
FIRE-Final Inspection | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 08:14:00. Contact: ###-####. detector for corridor door and penetrations 3/27/2001 2:03:12 PM
|
BLD-Final | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | FAIL |
Carl Dependahl
|
|
|
Tony ###-####, c/n issued, need braces,fire ok, etc. 12/21/2000 2:16:20 PM
|