BLD-Final | 6/4/2001 | 6/5/2001 | 6/5/2001 | P | PASS |
Jim Storey
|
|
|
Dale ###-#### ###-#### cell
|
BLD-Grading Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Energy code compliance | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 14:02:11. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by Inspector: 415 On 2/12/2001 11:39:19 AM ok to insulate 2/13/2001 10:56:51 AM
|
BLD-Framing/Rough-in | 2/9/2001 | 2/12/2001 | 2/12/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 16:29:17. Contact: ###-####.
|
BLD-Foundation | 12/8/2000 | 12/8/2000 | 12/8/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 08:07:35. Contact: ###-####.
wip 12/11/2000 8:41:23 AM
|
BLD-Foundation | 12/6/2000 | 12/7/2000 | 12/7/2000 | P | NR |
Tom Arcoraci
|
|
|
ERIK ###-#### FOUND WALL 12/7/2000 2:09:33 PM
|
BLD-Footing | 12/6/2000 | 12/6/2000 | 12/6/2000 | P | PART |
Tony Young
|
|
|
FT INSP -ERIK ###-####
wip, T. R. verbal ok.- ok to pour w/ verbal corrections. 12/6/2000 3:46:24 PM
|
BLD-Grading Inspection | 12/6/2000 | 12/6/2000 | 12/6/2000 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the engineer
|