Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03310
StatusFinaled
Name LARRY M WHITE
Site Address 3836 W QUAIL HEIGHTS CT
Project NameHILLSIDE
Customer Number938-9695
ePlanReviewNo
Description
To construct a 3326 sq. ft. one story single family dwelling with a 1120 sq. ft. attached three car garage and a 1054 sq. ft. partially covered concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and defensible space will be required. PC #965 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/16/20017/17/20017/17/2001APASS
DetailsTony Young
FN INSP LARRY -###-####
c of c issued 7/17/2001 10:47:15 AM
BLD-Grading Inspection7/11/20017/11/20017/11/2001 PASS
DetailsRita DeYoung
Grading and drainage complete according to approved plan.
BLD-Energy code compliance3/27/20013/28/20013/28/2001APASS
DetailsTony Young
###-####
c/n made ok 3/28/2001 11:21:22 AM
BLD-Framing/Rough-in3/21/20013/22/20013/22/2001PPART
DetailsTony Young
fr larry-- ###-####
c/n, ok to insulate 3/22/2001 1:17:03 PM
BLD-Framing/Rough-in2/20/20012/21/20012/21/2001APART
DetailsTony Young
###-####
ext. shear ok 2/21/2001 2:24:51 PM
BLD-Foundation12/21/200012/22/200012/22/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/21/2000 at 13:00:38. Contact: .walls ok 12/22/2000 9:46:26 AM
BLD-Grading Inspection12/22/200012/22/200012/22/2000 PASS
DetailsRita DeYoung
Engineer has approved remainder of footing subgrade.
BLD-Footing12/20/200012/21/200012/21/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/20/2000 at 13:30:50. Contact: ###-####.
BLD-Foundation12/7/200012/8/200012/8/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/07/2000 at 16:11:08. Contact: ###-####.
north retaining and garage wall ok to pour after verbal corrections are done 12/8/2000 11:35:42 AM
BLD-Footing12/4/200012/4/200012/4/2000PPART
DetailsTony Young
ft larry ###-####
wip on retaining wall ftg. and garage ftg.,, ok w/ verbal corrections 12/4/2000 4:14:40 PM
BLD-Grading Inspection12/1/200012/1/200012/1/2000 PASS
DetailsRita DeYoung
Received engineers approval of footing subgrade.