Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD00-03361
StatusFinaled
Name ST LUKES STL980228
Site Address 190 E BANNOCK ST
Project NameST LUKES-EAST TOWER
Customer NumberSTL980228
ePlanReviewNo
Description
ST. LUKE'S ED/NICU EAST TOWER EXPANSION - (SHELL & CORE PACKAGE) TO CONSTRUCT THE SHELL AND CORE PORTION OF THE NEW ST. LUKE'S EMERGENCY AND NEWBORN INTENSIVE CARE UNIT EAST TOWER EXPANASION. THE EAST TOWER EXPANSION IS A 79,455 SQ. FT., FOUR STORY HOSPITAL BUILDING EXPANSION WITH A 21,940 SQ. FT. SUB-BASEMENT AND A 21,085 SQ. FT. BASEMENT. THIS IS THE SECOND PHASE OF THE PROJECT BEING CONSTRUCTED AROUND THE FIRST PHASE CONCRETE STRUCTURAL FRAME, CONSTRUCTED UNDER PERMIT BLD00-02375. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. THIS IS A SHELL AND CORE PERMIT ONLY. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS WILL BE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH98-00057/CUP98-00038/PC#956-00/JCM THIS PERMIT HAS BEEN MODIFIED TO REVISE THE SIZE AND DESIGN OF THE SOUTH ENTRY CANOPY AND TO CONSTRUCT APPROXIMATELY 130 LINEAL FEET OF 8 FOOT WIDE ONE-HOUR CORRIDOR AT THE BASEMENT LEVEL TO CONNECT THE EXISTING HOSPITAL BUILDING WITH THE NEW ELEVATOR BANKS IN THE NEW EAST TOWER EXPANSION. JCM-2/19/02
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/12/200312/12/200312/12/2003 PASS
DetailsDave Hannah
BLD-Final7/17/20027/18/20027/18/2002APASS
DetailsCarl Dependahl
WENDEL; Phone #: ###-####; c/n ok, ok for permc/o (L/C). 7/18/2002 11:42:40 AM 7/18/2002 11:43:12 AM
BLD-Final7/17/20027/17/20027/17/2002PNR
DetailsCarl Dependahl
wendell; Phone #: ###-####
FIRE-Final Inspection7/17/20027/17/20027/17/2002PPASS
DetailsRick Jackson
wendell ###-#### -fire fn
BLD-Final7/15/20027/16/20027/16/2002ANR
DetailsCarl Dependahl
met w/ 409, fire ok 7/16/2002 12:03:16 PM
BLD-Final7/16/20027/16/20027/16/2002PNR
DetailsCarl Dependahl
Wendell ###-####
FIRE-Final Inspection4/9/20024/10/20024/10/2002AFAIL
DetailsRick Jackson
wendell jones- ###-#### fire fn penetrations; exit signs; audible for alarms not complete 4/10/2002 9:15:25 AM
FIRE-Final Inspection4/10/20024/10/20024/10/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 4/10/2002 9:15:46 AM
BLD-Wall cover4/5/20024/8/20024/8/2002APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/05/2002 at 14:49:31. Contact: ###-####.
FIRE-Final Inspection4/5/20024/8/20024/8/2002ACANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 04/05/2002 at 14:51:12. Contact: ###-####.
BLD-Concrete3/14/20023/15/20023/15/2002APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/14/2002 5:09:38 PM wendell ###-#### int concrete at 2hr rated expansion joint system, keep c/n issued w/ BLD00-02375 re joint install, etc. 3/15/2002 11:22:54 AM
BLD-Conference3/13/20023/13/20023/13/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/13/2002 4:40:54 PM re expansion joint firestop system; keep c/n
BLD-Final3/8/20023/8/20023/8/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/8/2002 1:26:18 PM rec'd eng's affidavit/ acceptance...ok; keep c/n re firestops, ok for t/o
BLD-Final3/7/20023/7/20023/7/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/07/2002 at 10:21:31. Contact: ###-####. c/n w/ BLD 01-00234...ok for t/o only. see c/n 3/7/2002 1:58:08 PM
FIRE-Final Inspection3/7/20023/7/20023/7/2002APART
DetailsRick Jackson
Scheduled by Inspector: 409 On 3/7/2002 10:14:09 AM awaiting completion of ground floor corridor 3/7/2002 3:16:14 PM
Code Occupancy Approval  3/1/2002 PASS
Inspection noted completion.
BLD-Conference2/11/20022/12/20022/12/2002APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 2/11/2002 2:33:20 PM ###-#### shell, need engs' affidavits; w/ BLD00-02375, add'l "shell" for concrete 2/12/2002 6:12:27 PM
BLD-Conference2/8/20022/8/20022/11/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 2/8/2002 11:31:54 AM ...unable to contact 2/11/2002 2:34:00 PM
BLD-Framing/Rough-in2/4/20022/5/20022/8/2002APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 2/4/2002 4:33:01 PM wendell ###-####...wip, keep c/n, complete firestops; need eng's ok for c/o 2/8/2002 4:38:46 PM
BLD-Conference2/5/20022/5/20022/6/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 2/5/2002 5:57:17 PM wendell ###-####, w/ Ziggy, plbg ok 2/7/2002 9:22:23 AM
BLD-Framing/Rough-in2/1/20022/4/20022/4/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/01/2002 at 16:50:02. Contact: .need all eng's, spec insps ok's; cert of value for modifications req'd 2/4/2002 6:11:21 PM
BLD-Conference2/1/20022/1/20022/1/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/1/2002 4:56:22 PM w/ wendell re resubmittal: canopy, need valuation, add'l spec insp or eng's insp report for framing changes.
BLD-Framing/Rough-in2/1/20022/1/20022/1/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/1/2002 4:58:42 PM shell...canopy only, need eng's verifications as built.
BLD-Conference1/29/20021/29/20021/29/2002PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/29/2002 12:38:05 PM w/ Wendall...need canopy plans 1/29/2002 6:14:30 PM
BLD-Conference1/3/20021/3/20021/3/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/3/2002 3:30:12 PM need approvals by all agencies for temp use...will have profit mtg.
BLD-Aging Inspection12/31/200112/31/200112/31/2001 NR
DetailsCarl Dependahl
NICU shell only, wip. 12/31/2001 1:22:59 PM
BLD-Aging Inspection10/29/200110/29/200111/5/2001 NR
DetailsCarl Dependahl
shell only, Nicu phase 2; wip 11/5/2001 12:05:29 PM
BLD-Aging Inspection8/27/20018/27/20018/27/2001 PART
DetailsCarl Dependahl
St Lukes East tower/ NICU; wip 8/27/2001 11:35:53 AM
BLD-Conference8/27/20018/27/20018/27/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/27/2001 11:30:10 AM w/ Wendall onsite. wip, receiving spec insp reports.
BLD-Conference6/26/20016/26/20016/26/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/26/2001 11:31:21 AM onsite w/ Wendall & framer
BLD-Framing/Rough-in6/25/20016/25/20016/25/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/25/2001 9:26:36 AM ok to pre-rock at shafts...back of elec chase, along north stair, call for insps when ready.
BLD-Framing/Rough-in6/14/20016/14/20016/14/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/14/2001 8:46:59 AM shafts at ground level...fasten edges of core bd. at non-c-h studs/corners; wip ok to continue.
BLD-Aging Inspection6/4/20016/4/20016/4/2001 PASS
DetailsCarl Dependahl
wip...recvg spec insp reports,deck & col's being placed 6/4/2001 9:55:54 AM
BLD-Concrete6/4/20016/4/20016/4/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/4/2001 3:24:54 PM part, pend spec insp.