Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD00-03370
StatusFinaled
Name GARRIK CONSTRUCTION N.W.
Site Address 6122 S TETON PEAK WAY
Project Name 
Customer Number386-9850
ePlanReviewNo
Description
1/26/2K1 plans resubmitted adding 481s.f. to the upper floor level leaving a total of 1342 for same, plans have been re-reviewed and add valuation added $42 xtra planreview to be added also..pep1/26/2K1
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/15/20015/16/20015/16/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/15/2001 at 20:35:39. Contact: ###-####. C. of C. #20429 issued 5/16/2001 8:20:36 AM
BLD-Energy code compliance3/10/20013/12/20013/12/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/10/2001 at 14:08:58. Contact: ###-####. still need to fix floor joist in crawl space check at final 3/12/2001 9:36:15 AM
BLD-Energy code compliance3/8/20013/9/20013/9/2001PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/08/2001 at 18:16:49. Contact: ###-####.need to complete insulation and recall. 3/9/2001 2:01:21 PM
BLD-Framing/Rough-in3/8/20013/9/20013/9/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/08/2001 at 18:16:05. Contact: ###-####. Air seal package completed--still need eng. or replacement of damaged floor joist in crawl--ok to insulate. 3/9/2001 8:47:54 AM
BLD-Framing/Rough-in3/8/20013/8/20013/8/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/08/2001 at 10:19:17. Contact: ###-####.c/n posted--air seal package needed and manufactures repair on bci floor joist which has been damaged. 3/8/2001 1:10:46 PM
BLD-Framing/Rough-in2/24/20012/26/20012/26/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 02/24/2001 at 14:02:22. Contact: ###-####. SHEAR--OK TO SIDE 2/26/2001 9:11:51 AM
BLD-Foundation11/29/200011/29/200011/29/2000APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 11/29/2000 at 07:17:33. Contact: ###-####.
BLD-Foundation11/28/200011/28/200011/28/2000PNR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 11/28/2000 at 09:06:38. Contact: ###-####. called will reschedule. 11/28/2000 2:39:10 PM
BLD-Footing11/20/200011/21/200011/21/2000APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 11/20/2000 at 17:30:41. Contact: ###-####. Reviewed rebar requirments. 11/21/2000 9:27:07 AM
BLD-Footing11/20/200011/20/200011/20/2000PCANC
DetailsDave Hannah
ready at 3 pm ###-####