MICRON BUILDING 01 - F1, F1X IPS 046 RELOCATION (01X-20014022) * TO DEMO. AND REMOVE EXISTING INTERIOR PARTITIONS, DOORS AND CEILING GRID AT PROJECTS REBUILD ROOM 103A, AS WELL AS CUT SLAB FLOOR AND EXCAVATE FOR NEW ACCESS FLOOR. TO CONSTRUCT NEW CONCRETE SLAB AND RETAINING WALLS, ACCESS FLOOR SYSTEM, NEW INTERIOR PARTITIONS, DOORS AND SUSPENDED CEILING SYSTEM TO CREATE NEW 105 SQ. FT., BAY 13 (107Z) AND 380 SQ. FT., PLENUM 16 (016PL). THIS WORK IS BEING DONE IN THE NORTHEAST CORNER OF THE FIRST FLOOR OF BUILDING #01 BETWEEN GRID LINES F1&H AND 1&2. ALL CONSTUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. PC#288-01/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/25/20016/25/20016/25/2001PPASS
DetailsJim Storey
fn insp wayne ###-#### final ok card on site. 6/26/2001 10:46:29 AM
FIRE-Final Inspection5/15/20015/16/20015/16/2001PPASS
DetailsRick Jackson
###-####
BLD-Foundation3/28/20013/29/20013/29/2001APART
DetailsJim Storey
found -- wayne ###-#### placed with special insp. pending report. 3/30/2001 11:41:47 AM
BLD-Conference3/12/20013/12/20013/12/2001PPART
DetailsJim Storey
###-#### recomended submit for plan modifacation to plan review. 3/12/2001 1:27:41 PM
BLD-Framing/Rough-in1/18/20011/19/20011/19/2001APASS
DetailsJim Storey
wall cover Wayne ###-####
BLD-Foundation1/10/20011/11/20011/11/2001APART
DetailsJim Storey
###-#### placed with special insp. pending report.no insp. 1/11/2001 9:11:29 AM
BLD-Footing1/2/20011/2/20011/2/2001PPART
DetailsJim Storey
RE BAR WAYNE ###-#### placed with special insp. 1/2/2001 3:23:09 PM