Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03463
StatusFinaled
Name BAKERS
Site Address 350 N MILWAUKEE ST Unit: 1170
Project NameBTS - #1170
Customer Number 
ePlanReviewNo
Description
To remodel a 1,704 sq.ft. retail tenant space on the lower level per approved plans on file. Work includes removing all interior partitions along with restroom fixtures and storefront, and reconstructing new storefront, one fully accessible restroom, noncombustible partition between storage area and retail sales, installation of a new suspended ceiling system, Plumbing Electrical and mechanical work. Miscelaneous related interior finishes. NOTE: This building is fully fire sprinklered and has a smoke control system. Any modifications or alterations to the fire sprinkler system shall be per nfpa #13 as regulated by the fire department. The smoke evacuation system shall remain functional as installed under the 1985 UBC. (P.C.#983-00)*RMH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/27/20012/28/20012/28/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/27/2001 at 12:57:55. Contact: ###-####.
BLD-Final2/26/20012/27/20012/27/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/26/2001 at 15:06:54. Contact: ###-####.ok temp oc,c/n racking addnl support note,nothing specific on plans. 2/27/2001 2:05:43 PM
FIRE-Final Inspection2/24/20012/26/20012/26/2001PPASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 2/27/2001 8:12:14 AM
BLD-Final2/22/20012/23/20012/23/2001PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/22/2001 at 14:00:54. Contact: ###-####. need fire, recall... 2/23/2001 12:56:18 PM
FIRE-Final Inspection2/22/20012/23/20012/23/2001AFAIL
DetailsJoe Tawney
###-####. Final Fail vent, exh damper, possible door hdwre 2/23/2001 12:03:17 PM
FIRE-Final Inspection2/20/20012/21/20012/21/2001APART
DetailsJoe Tawney
###-####. OK on spklr rough in 2/21/2001 12:26:52 PM
FIRE-Alarm Testing2/20/20012/21/20012/20/2001ACANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 02/20/2001 at 15:53:04. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/20/2001 at 15:59:12.
BLD-Framing/Rough-in2/9/20012/12/20012/12/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/09/2001 at 11:48:05. Contact: ###-####. c/n ok, cover ply at restrm lid/roof, chk at final. 2/12/2001 4:48:41 PM
BLD-Framing/Rough-in2/1/20012/2/20012/2/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/01/2001 at 09:11:33. Contact: ###-####.c/n posted for support and complete front entrance. 2/2/2001 2:14:23 PM