BLD-Final | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 12:57:55. Contact: ###-####.
|
BLD-Final | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 15:06:54. Contact: ###-####.ok temp oc,c/n racking addnl support note,nothing specific on plans. 2/27/2001 2:05:43 PM
|
FIRE-Final Inspection | 2/24/2001 | 2/26/2001 | 2/26/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 2/27/2001 8:12:14 AM
|
BLD-Final | 2/22/2001 | 2/23/2001 | 2/23/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 14:00:54. Contact: ###-####. need fire, recall... 2/23/2001 12:56:18 PM
|
FIRE-Final Inspection | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | FAIL |
Joe Tawney
|
|
|
###-####. Final Fail vent, exh damper, possible door hdwre 2/23/2001 12:03:17 PM
|
FIRE-Final Inspection | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PART |
Joe Tawney
|
|
|
###-####. OK on spklr rough in 2/21/2001 12:26:52 PM
|
FIRE-Alarm Testing | 2/20/2001 | 2/21/2001 | 2/20/2001 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 15:53:04. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/20/2001 at 15:59:12.
|
BLD-Framing/Rough-in | 2/9/2001 | 2/12/2001 | 2/12/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 11:48:05. Contact: ###-####. c/n ok, cover ply at restrm lid/roof, chk at final. 2/12/2001 4:48:41 PM
|
BLD-Framing/Rough-in | 2/1/2001 | 2/2/2001 | 2/2/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 09:11:33. Contact: ###-####.c/n posted for support and complete front entrance. 2/2/2001 2:14:23 PM
|