BLD-Final | 1/25/2001 | 1/26/2001 | 1/26/2001 | A | PASS |
Jim Sly
|
|
|
###-#### C/C issued 1/26/2001 12:37:15 PM
|
BLD-Energy code compliance | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
SCOTT- ###-#### ENERGY CODE -RE-INSP
|
BLD-Framing/Rough-in | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
SCOTT ###-#### FR -RE-INSP
|
BLD-Framing/Rough-in | 1/3/2001 | 1/4/2001 | 1/4/2001 | A | PART |
Dave Hannah
|
|
|
###-#### scott reinspection ok to insulate c/n on site 1/4/2001 3:31:40 PM
|
BLD-Framing/Rough-in | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | FAIL |
Dave Hannah
|
|
|
###-#### 1/3/2001 11:40:51 AM
|
BLD-Foundation | 12/1/2000 | 12/4/2000 | 12/4/2000 | A | PASS |
Jim Sly
|
|
|
Chris ###-####
|
BLD-Footing | 11/30/2000 | 12/1/2000 | 12/1/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 16:48:15. Contact: ###-####.
|