BLD-Final | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued 4/19/2001 8:08:52 PM
|
BLD-Energy code compliance | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Jim Sly
|
|
|
energy code chuck ###-####
|
BLD-Energy code compliance | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Jim Sly
|
|
|
energy code chuck ###-####
|
BLD-Framing/Rough-in | 1/26/2001 | 1/29/2001 | 1/29/2001 | A | CANC |
Jim Sly
|
|
|
FR INSP CHUCK ###-#### cancel per chuck
|
BLD-Framing/Rough-in | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Jim Sly
|
|
|
chuck-- ###-#### fr insp
|
BLD-Framing/Rough-in | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Jim Sly
|
|
|
chuck-- ###-#### fr insp
|
BLD-Framing/Rough-in | 1/25/2001 | 1/26/2001 | 1/26/2001 | A | FAIL |
Jim Sly
|
|
|
###-#### Chuck C/N Hold Down nailing. 1/26/2001 10:05:03 AM
|
BLD-Framing/Rough-in | 1/25/2001 | 1/25/2001 | 1/25/2001 | P | PART |
Jim Sly
|
|
|
shear Chuck ###-#### Shear OK. 1/25/2001 3:40:07 PM
|
BLD-Foundation | 12/5/2000 | 12/5/2000 | 12/5/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 05:16:40. Contact: ###-####.
|
BLD-Footing | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/04/2000 at 10:06:26. Contact: ###-####.
|