Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-03524
StatusFinaled
Name CLARK PHOTOGRAPHY
Site Address 783 W IDAHO ST
Project NameCAPITOL TERRACE
Customer Number 
ePlanReviewNo
Description
(CLARK PHOTOGRAPHY) Fire sprinklers used to meet high-rise provisions. To remodel an existing 1,142 square foot retail tenant space on the first floor of Capitol Terrace. In addition, the existing stair enclosure that serves the upper floors is being modified on the first floor. Work is to include a 2-hr stair enclosure wall, a 36 inch wide exterior door from the stair enclosure, interior nonbearing walls, two arched door ways, and an interior door all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-1003-00 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference10/26/200110/26/200110/26/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/26/2001 2:00:20 PM rec'd arch's letter re 1hr corridors at bsmt...conc. deck ok as 1hr rating for lid.
BLD-Final10/26/200110/26/200110/26/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/26/2001 5:01:20 PM brought card in, final ok for c/o
Permanent Occupancy 10/26/200110/26/2001 DONE
Details
BLD-Conference10/10/200110/10/200110/10/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/10/2001 2:05:55 PM spoke w/ Larry Hanson, prop mgr...will advise tenant space not finalled by contractor...all work appears complete,card not turned in.
BLD-Aging Inspection10/8/200110/8/200110/8/2001 NR
DetailsCarl Dependahl
left msg w/ mgr. 10/10/2001 2:06:27 PM
BLD-Aging Inspection8/6/20018/6/20018/6/2001 PASS
DetailsCarl Dependahl
called contractor; will take card in...ok for c/o 8/6/2001 9:46:02 AM
BLD-Aging Inspection5/16/20015/16/20015/16/2001 PART
DetailsCarl Dependahl
This is an aging activity...called contractor Steve Miller/( for Larry Hanson)...had elec problem, will take card in, shows as ok for all. 5/16/2001 2:03:30 PM
BLD-Final2/12/20012/12/20012/12/2001PPASS
DetailsCarl Dependahl
###-####; struct ok. 2/12/2001 3:31:47 PM
BLD-Final2/2/20012/2/20012/2/2001PFAIL
DetailsCarl Dependahl
###-####, c/n need panic hdwe at stair exit 2/2/2001 2:52:30 PM
FIRE-Final Inspection2/2/20012/2/20012/2/2001PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/2/2001 2:32:05 PM
BLD-Final1/29/20011/29/20011/29/2001PNR
DetailsCarl Dependahl
steve ###-#### fn
BLD-Framing/Rough-in1/29/20011/29/20011/29/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/29/2001 11:23:22 AM infill, add sealant, chk at final
FIRE-Final Inspection1/29/20011/29/20011/29/2001PNH
DetailsRick Jackson
fn fire steve- ###-#### stopped by 2:00 and the doors wee locked; stopped by on 01/29/01 at 4:00 and doos were locked 1/30/2001 2:29:14 PM
BLD-Conference1/26/20011/26/20011/26/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/26/2001 3:05:31 PM w/ bldr, use 2hr assy at infill at stair