BLD-Final | 4/20/2001 | 4/20/2001 | 4/20/2001 | P | PASS |
Dave Hannah
|
|
|
reinspection Larry ###-####
|
BLD-Final | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Wall cover | 3/6/2001 | 3/7/2001 | 3/7/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 14:08:03. Contact: ###-####. ok to cover 3/8/2001 9:28:38 AM
|
BLD-Framing/Rough-in | 3/6/2001 | 3/6/2001 | 3/6/2001 | A | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 3/6/2001 10:48:27 AM ok to insulate c/n on site
|
BLD-Framing/Rough-in | 3/2/2001 | 3/5/2001 | 3/5/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 12:25:32. Contact: ###-####. c/n on site 3/5/2001 3:05:28 PM
|
BLD-Framing/Rough-in | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | PASS |
Dave Hannah
|
|
|
shear panel larry-- ###-#### re-insp
|
BLD-Framing/Rough-in | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### need more stapels on shear panels 2/20/2001 3:07:19 PM
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PASS |
Russ Owen
|
|
|
###-#### FIRE WALL
|
BLD-Foundation | 1/26/2001 | 1/26/2001 | 1/26/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 07:42:31. Contact: ###-####.
|
BLD-Footing | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PART |
Dave Hannah
|
|
|
###-####
|