Permanent Occupancy | | 5/14/2001 | 5/14/2001 | | DONE |
|
|
|
|
BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | P | PART |
Jim Storey
|
|
|
Matt ###-#### tenp ok pending perm plm and health dept. and bld. 3/16/2001 3:21:04 PM
|
FIRE-Final Inspection | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Rick Jackson
|
|
|
Matt ###-####
|
BLD-Final | 3/14/2001 | 3/15/2001 | 3/15/2001 | P | CANC |
Jim Storey
|
|
|
matt 869- 9245 fn occ
|
FIRE-Final Inspection | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | FAIL |
Rick Jackson
|
|
|
matt-- ###-#### fire fn occupant load sign; detectors for AHU shutdown; air balance report for hood system; tested suppression system - okay 3/15/2001 2:08:49 PM
|
BLD-Other | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/08/2001 at 15:52:57. Contact: ###-####. shaft and ceilling o 3/9/2001 10:07:04 AM
|
BLD-Other | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 10:05:06. Contact: ###-####. 1st layer of duct wrap ok work in progess. 3/5/2001 2:34:12 PM
|
FIRE-Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 10:41:29. Contact: ###-####. discussed requirements for using firemaster listing; AHU shutdown detectors; exit signs and extinguishers 2/27/2001 3:54:54 PM
|
BLD-Framing/Rough-in | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 12:16:52. Contact: ###-####. sheer wall repaired to ingineering recieved in the field. 2/20/2001 8:44:15 AM
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PART |
Jim Storey
|
|
|
###-#### ok to cover all but tunnel corridor mest be reframed/need sheer wall engineering for ele boxes over cut sheathing 1 sq/ft all box penatrations. 2/13/2001 2:01:57 PM
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PART |
Jim Storey
|
|
|
###-#### ok to cover all but tunnel corridor mest be reframed/need sheer wall engineering for ele boxes over cut sheathing 1 sq/ft all box penatrations. 2/13/2001 2:01:57 PM
|