BLD-Final | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/26/2001 at 10:37:44. Contact: ###-####. final ok l/c on site. 9/27/2001 9:38:19 AM
|
BLD-Final | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/26/2001 at 10:37:44. Contact: ###-####. final ok l/c on site. 9/27/2001 9:38:19 AM
|
BLD-Final | 9/11/2001 | 9/12/2001 | 9/12/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 17:12:24. Contact: ###-####.c/n posted . 9/12/2001 12:21:20 PM
|
BLD-Aging Inspection | 8/6/2001 | 8/6/2001 | 8/6/2001 | | PART |
Jim Storey
|
|
|
wip 8/6/2001 8:21:51 AM
|
BLD-Wall cover | 5/30/2001 | 5/30/2001 | 5/30/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 08:43:11. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/29/2001 | 5/29/2001 | 5/29/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 10:44:01. Contact: ###-####. ok to insulate has some prior c/n items to correct. 12/30/2001 10:12:59 AM
|
BLD-Framing/Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | FAIL |
Jim Storey
|
|
|
randy-- ###-#### re-insp fr c/n parcial insp only. 5/8/2001 5:03:31 PM
|
BLD-Framing/Rough-in | 4/4/2001 | 4/5/2001 | 4/5/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 14:59:31. Contact: ###-####.
c/n posted, no inspection made, need to get remodel permit , (added about 300 plus sqaure ft.) also look for point load issues, 1 hr. seperation/ ducting, property line issues/ openings, other issues 4/5/2001 11:50:36 AM
|
BLD-Framing/Rough-in | 3/22/2001 | 3/23/2001 | 3/23/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/22/2001 at 19:55:55. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/21/2001 | 3/22/2001 | 3/22/2001 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 20:14:02. Contact: ###-####. need to nail all shear panels per plan nail hds at rear of house install mst-48 straps at front 3/22/2001 9:08:51 AM
|
BLD-Framing/Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 10:08:44. Contact: ###-####. to 420 3/21/2001 3:15:54 PM
|
BLD-Framing/Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 | P | NR |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 3/21/2001 2:07:06 PM
|
BLD-Foundation | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Steven Webb
|
|
|
###-####: hd not installed at time of inspection. 2/9/2001 2:51:17 PM
|
BLD-Footing | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 16:55:45. Contact: ###-####.
|