BLD-Final | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 08:44:41. Contact: ###-####. ok for perm occ 3/6/2001 2:22:16 PM
|
Permanent Occupancy | | 3/6/2001 | 3/6/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy. 3/5/2001 12:34:35 PM
|
FIRE-Final Inspection | 3/2/2001 | 3/2/2001 | 3/2/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### early pm Final Fail C/N issued 3/5/2001 8:14:21 AM
|
BLD-Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 2/27/2001 5:19:44 PM Conf with contr regarding fire and life safety issues
|
BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### need submittal from arch to change to wood studs 2/5/2001 2:40:08 PM
|
BLD-Conference | 1/29/2001 | 1/30/2001 | 1/30/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-####conf with building owner make sure and call first; conf on draft stop need arch detail forv same 1/30/2001 11:30:56 AM
|
BLD-Framing/Rough-in | 1/25/2001 | 1/26/2001 | 1/26/2001 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/25/2001 at 11:36:41. Contact: ###-####. cn posted on draft stop and eng for cmu opening 1/25/2001 2:39:14 PM
|